Forms and Brochures

OR Handouts | WA Handouts

Ready Built, Easy Plans and
other helpful information for building

 Ready Built Plans

Do I Need...

New Single-Family, Additions, or Alteration Forms

  • Each of these forms are required during the Building process.
  • The Energy Additional Measure Selection is due at time of permit.
  • The Exterior Wall Enhanced Drainage form is due at ......
  • The Moisture Content Acknowledgement is due at the Framing Inspection.
  • The Certificate of Lighting Fixtures is due at the Final Building Inspection.